Semi Factory Nevada

Semi Factory Nevada

Semi

Summary

Semi Factory Nevada

Dedicated high-volume Tesla Semi plant (SFNV) on the Tahoe-Reno Industrial Center, just north of Gigafactory Nevada.

Background

Semi Factory Nevada is the stand-alone Semi building at TRIC/Sparks, adjacent north of Gigafactory Nevada. After early Semi work inside GF1, Tesla broke ground in January 2024 on a dedicated high-volume plant. Aerials show SEMI roof lettering, docks, and desert site infrastructure as the structure rose through 2024 toward late-2025 volume production.

Timeline

  1. $3.6B Giga Nevada expansion

    Tesla announces a major Nevada expansion covering Semi volume and 4680 cell work.

  2. Earthwork / pad prep

    Earthwork and WOW prep visible on the dedicated Semi pad north of GF Nevada.

  3. Semi building groundbreaking

    Groundbreaking for the dedicated high-volume Semi Factory Nevada building at TRIC/Sparks.

  4. Steel rising

    Steel deliveries arrive; the main structure starts to rise.

  5. Structural steel topped out

    Main structural steel is topped out on the Semi hall.

  6. Envelope advancing

    Walls and building envelope continue across the hall.

  7. Stamping shop complete

    Stamping shop finished; tooling install underway.

  8. Fit-out toward volume

    Interior fit-out toward high-volume Semi production (late 2025 target).

Job listings

Open roles at Semi Factory Nevada

US listings for this plant on Tesla Careers.

Timelapse

Yearly construction stills at Semi Factory Nevada

Yearly slideshow from the same satellite stills as Compare — play a year of construction without leaving the page.

Drone flyovers

Aerial clips of Semi Factory Nevada

Curated YouTube clips — newest first. Same campus, different altitude.

Independent fan project — not affiliated with Tesla, Inc. Factories move fast; details here can lag