Summary
Tesla’s first Gigafactory — battery cells and Powerwall on the Tahoe-Reno Industrial Center east of Sparks. High-volume Semi production moved to the adjacent Semi Factory Nevada.
Tesla’s first Gigafactory — battery cells and Powerwall on the Tahoe-Reno Industrial Center east of Sparks. High-volume Semi production moved to the adjacent Semi Factory Nevada.
Announced in 2014 as a Tesla–Panasonic cell plant in the Nevada desert. Empty sagebrush became the company’s battery hub: 18650/2170 cells, later 4680 work, and Powerwall. Early Semi assembly also started here before the dedicated Semi Factory Nevada building rose just north of campus. Megapack production later moved to Lathrop. From the air the site is a huge rectangular factory with rail, parking, and ongoing energy-side expansion.
Tesla and Panasonic pick Storey County for the first Gigafactory.
The first factory blocks go up on empty desert.
Official opening; Panasonic cell production is already underway.
Tesla starts 4680 development and early production work at Nevada.
Megapack assembly moves toward Lathrop; Nevada keeps cells and Powerwall. Semi volume later shifts to the dedicated Semi Factory next door.
First customer Semis leave Gigafactory Nevada (before the dedicated Semi Factory was built).
“Big energy” build-out shows from the air on Electric Avenue.
US listings for this plant on Tesla Careers.
Yearly slideshow from the same satellite stills as Compare — play a year of construction without leaving the page.
Curated YouTube clips — newest first. Same campus, different altitude.