Semiconductor campus — Tesla and SpaceX building the next industrial footprint together.

Chip
Jobs

Summary

Tesla × SpaceX semiconductor campus in Grimes County — still mostly land clearing as of late 2026. pilot chip plant work is underway at tesla gigafactory austin

Background

Tesla started a research-fab precursor on the north side of Giga Texas in 2026. The large Terafab site itself is Grimes County land (near the old Gibbons Creek plant), confirmed with SpaceX in August 2026. Filings talk about construction starting later in 2026. Public drones so far show clearing and start of construction as of september 2026

Timeline

  1. Austin precursor

    Tesla breaks ground on a research fab at Giga Texas, described as a precursor to Terafab.

  2. Terrafab announced

    Tesla and SpaceX confirm Terafab

  3. Land clearing

    First droneflight by Joe Tegtmeyer , mass clearing already underway.

  4. First footings under construction

    Drone footage shows construction has started for the first footings

Job listings

Open roles at Terafab

US listings for this plant on Tesla Careers.

Timelapse

Yearly construction stills at Terafab

Yearly slideshow from the same satellite stills as Compare — play a year of construction without leaving the page.

Drone flyovers

Aerial clips of Terafab

Curated YouTube clips — newest first. Same campus, different altitude.