BT
BuildingTesla
Shanghai Megafactory

Shanghai Megafactory

Megapack manufacturing campus in China.

MP
Jobs

Summary

Tesla’s first Megapack plant outside the U.S. — energy storage next to Giga Shanghai in Lingang.

Background

Tesla said in 2023 that Shanghai would get a Megapack factory. Site work is visible from the air in April 2024; the official groundbreaking is May 23, 2024. Construction finished in about seven months. Trial production started around year-end 2024, with the first China-made Megapacks in early 2025. Local drone filming largely stops after a May 2024 flight ban.

Timeline

  1. Energy plant announced

    Tesla says Shanghai will get a Megapack factory near Giga Shanghai.

  2. Site work visible

    Drone flights show the Lingang energy-storage site under construction.

  3. Construction continues

    Aerial notes slower-looking progress on the halls.

  4. Official groundbreaking

    Tesla holds a construction-start ceremony; local filming hits a flight ban.

  5. More hall work

    Follow-up flight as Megapack buildings continue.

  6. Trial production

    Construction is largely done in about seven months; trial production starts.

  7. First Megapacks

    First China-made Megapacks leave the plant; early export is reported to Australia.

Job listings

Open roles at Shanghai Megafactory

US listings for this plant on Tesla Careers.

Timelapse

Yearly construction stills at Shanghai Megafactory

Yearly slideshow from the same satellite stills as Compare — play a year of construction without leaving the page.